CLIENT: AL ALI PROPERTY INVESTMENT.
MAIN CONTRACTOR: AL QIWANI AIR CONDITIONING LLC
Replacement of Existing Chilled Water Thermal Insulation
- Removal and disposal of the existing thermal insulation over the chilled water piping network throughout the building, in compliance with environmental and safety standards.
- Supply and installation of new cross-linked closed-cell polyolefin foam insulation (XLPE), factory-bonded with reinforced pure aluminum foil.
- Installation shall be carried out over all exposed and concealed chilled water pipes across the building, ensuring proper vapor barrier, fire resistance, and thermal efficiency.
- Includes all related civil works required for access, pipe exposure, and restoration of disturbed surfaces (e.g., ceilings, walls, pipe shafts).
- Replacement of Existing Gypsum Ceiling and Related Civil Works