CLIENT: DEWA (DUBAI ELECTRICITY AND WATER AUTHORITY)
MAIN CONTRACTOR: AL QIWANI AIR CONDITIONING LLC
Scope of Works :
Supply and Installation of Ventilation Ducts, Fresh Air Fans, and Ecology Units
- Preparation of Heat Load Calculation with Reports.
- Preparation of Shop Drawings and Electrical Layouts as per the Requirements.
- Supply, fabrication, and installation of ventilation ductwork (MS and GI ) as per approved drawings and site requirements.
- Supply and installation of Fresh Air Fans to ensure adequate ventilation and indoor air quality.
- Supply and installation of Ecology Units for kitchen or other exhaust systems, including all necessary connections, supports, and accessories to ensure proper filtration and compliance with environmental standards.
- Supply and Installation of VFD Control Panel for the FAF and ECU with Related power calling and DB Modification Works
- Third Party testing and Air Balancing and Commissioning Works.
- Supply and Installation of 0.7mm Cladding on the Roof Fresh Air and Extract Air Ducts.