JA BEACH HOTEL RENOVATION WORKS @ JEBAL ALI -UAE

CLIENT / CONSULTANT: BKA FACILITIES MANAGEMENT LLC3

CONTRACTOR: AL QIWANI AIR CONDITIONING LLC

Scope of Works – Chilled Water System Replacement

1. Replacement of Chilled Water Fan Coil Units (FCUs) and Air Handling Units (AHUs)

    • Removal and replacement of existing Chilled Water FCUs and AHUs with new units, including all associated mounting accessories and supports.
    • Supply and installation of new valve packages (including control valves, strainers, balancing valves, and isolation valves) for each unit to ensure proper flow and control.
    • Pressure testing of the system post-installation to verify leak-free connections and system integrity.
    • Chemical flushing of the chilled water circuit to remove sludge, scale, and other impurities, ensuring optimal performance of new equipment.

    2. Replacement of Existing Chilled Water Piping with Thermal Insulation

      • Removal of existing chilled water piping as required and installation of new chilled water pipes, sized and routed as per design and site conditions.
      • Supply and installation of new thermal insulation over all chilled water piping using closed-cell insulation material with proper vapor barrier and finish (e.g., aluminum foil cladding).
      • Execution of all related civil works, including core cutting, pipe support modifications, wall/ceiling reinstatement, and surface finishing as necessary.