BOUNCE – FESTIVAL CITY MEP WORKS

CLIENT: BKA FACILITIES MANAGEMENT

CONTRACTOR: AL QIWANI AIR CONDITIONING LLC

Scope of Works

1. Heat Load Calculation

  • Preparation of a detailed heat load calculation based on actual site conditions to determine the required air conditioning capacity and system design.

2. Servicing of Existing FCU Units with Third-Party Performance Testing

  • Comprehensive servicing of all existing Fan Coil Units (FCUs).
  • Coordination and execution of third-party performance testing for both chilled water and air systems to verify operational efficiency and compliance.

3. Supply and Installation of Additional Ducted Split AC Units

  • Supply and installation of ducted split air conditioning units in accordance with the heat load calculation.
  • Includes all related ducting works required for proper distribution and return air systems.

4. Power Cabling Works

  • Supply and laying of power cables necessary to support the operation of the new HVAC systems.

5. Electrical Distribution Board (DB) Installation

  • Supply and installation of a new electrical distribution board, including all associated electrical connections and safety components.

6. Core Cutting and Civil Works

  • Execution of core cutting required for refrigerant and drainage pipe routing.
  • Includes all associated civil works, such as sealing, surface finishing, and restoration to original condition where applicable